Flying and Pack-Up
04/02/12 aircraft return from PIK & MIX
20/02/12 1100. Final road freight weights/dimensions to be sent to shipping agent. Boxes are to contain absolutely NO dangerous or hazardous goods.
22/02/12 MEVALI pack-up to be at Cranfield
24/02/12 road freight pack-up departs Cranfield @ 1100.
28/02/12 or 29/02/12 - MEVALI test flight, LTI noise test flight
01/03/12 - 02/03/12 146 pack-up, final aircraft preparations, post test-flight instrument rectification
05/03/12 Aircraft departs for Kiruna
Equipment Removal
06/02/12 - Fri 10/02/12 equipment removal
Equipment to be removed:
Neph/PSAP/Filters
SID3
Manchester Cloud Rack
CPI
CAPS
(James Dorsey collecting Manchester equipment between 10th & 13th February)
Equipment Refit
21/02/12 - final date for the return of CIMS, SWS, MARSS and WAS cases to Cranfield 06/02/12 - 22/02/12 - aircraft available for instrument refit
(CIMS staff refitting CIMS Friday 17th February)
(Met Office staff delivering SWS 21/02/12)
Equipment to be fitted:
CIMS
CIMS inlet
SWS rack
SWS head
SHIMS
MARSS
CCN rack
gas bottle stowage
WAS cases
Instrument Maintenance/Calibrations
06/02/12 - 27/02/12 - aircraft available for maintenance and calibration
01/03/12 - 02/03/12- aircraft available for post test-flight instrument rectification
Other Work
Preparation for LTI noise test
Terminate gas line for CIMS rack
|